Saturday, April 2, 2016
Hopefully Monday we will start moving dirt in preparation for the solar electric system. We wanted to take some pictures of the area as it is before the construction starts. This is the chapel with the old administration/classroom building in the back right. The solar panels will be off to the right.
This is the construction site looking back at the chapel. The new administration building is to the right of the hedge. You can just see a corner of the roof. There are 4 terraces between the hedge and the road on the left. You can just see a piece of the road in the top left.
This is looking from the construction site up the hill towards the administration building.
There is a rope on the ground showing where we will dig out one terrace to create a larger flat area for the panel structure at the level just to the right of the tree. The tree will have to be cut down. The library is in the near background and the dining hall in the far back right.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment